done - >600V cable Testing: cable tracing and fault location, high voltage terminating
done - Air oil, gas, and vacuum circuit breakers
done - Asbestos removal and electrical equipment
done - battery maintenance
done - Busbar ducts
done - Contact replacement or refurbishment
done - Control Panels
done - Controls and Instrumentation installation
done - DC Hi-Pot testing on oil-impregnated cables, AC Hi-Pot testing to XLPE cables (short distance); Engineering Services: short circuit
done - Electrical distribution
done - Electrical Installation
done - Electrical maintenance of sites; maintenance and testing of HV transformers; HV/LV circuit breakers
done - Electrical switchboards
done - Engineer review and management of reports and records. Substation surveys
done - Exit/Emergency light testing; Transformers: Oil testing (to NATA standard): Oil quality, dissolved gas analysis, PCB testing, Ph
done - Fibre Optic installation
done - Fuse gear
done - High energy transformer
done - High Voltage Reticulation installation
done - High Voltage Substation installation
done - High voltage switchboards
done - HV/LV circuit breakers
done - Instrumentation installation
done - Insulator cleaning
done - Low Voltage distribution and installation
done - Maintenance switchgear
done - Motor Control Centre maintenance
done - Motor Control centres
done - Motor Controls
done - Porcelain fuses
done - Powder metallurgy
done - Power Factor correction
done - Powerline comm
done - Preventative maintenance programs
done - Raching 19
done - Reclosers and sectionalisers repairs
done - Refrigeration
done - Refurbishment and mtc
done - refurbishment and repairs
done - repairs, refurbishment, retrofit mtc.; Motor control
done - Retrofit Mtc
done - Rewinding
done - Sheet Metal Fabrication
done - Sintered procts
done - Spare parts supply
done - Switchboard design
done - Switchboard Maintenance
done - Switchboards
done - Switchgear Servicing
done - TEGG Services - customised maintenance programs
done - Test and Commission Switchgear: Trip time testing/time travel tests; Primary & secondary injection relay testing AC/DC Hi-pot te
done - Thermography
done - Thermography testing and earth testing
done - Transformer services
done - Transformers: Transformer repairs, refurbishment and mtc. Polychlorinated Biphenyis (CB) removal; Oil filtration and reclamation
done - UPS testing
done - Vibration Analysis
done - Voice and data cable installation